The
new national hockey stadium in
Ghana
The newly constructed Hockey
stadium in Accra, Ghana is a
powerful landmark facility
combining dynamic authentically
pleasing architecture with a
modern water based pitch.
The 1,200-seating capacity
stadium was built to host the
11-day Africa Cup Hockey
Tournament.
The newly constructed Hockey
Stadium located between the main
vehicular transport terminal in
Central Accra popularly known as
Tema Station and the
headquarters of the Electricity
Company of Ghana (ECG), has
state of the art water based
pitch constructed and installed
with the synthetic turf product,
Edel Triple T EL System by a
Belgium based grass experts,
Edel Grass.
The installed hockey pitch was
tested by an International
Hockey Federation accredited
laboratory and found to comply
with all the performance
requirements established by this
federation for the conduct of
world level hockey competitions,
specified international
competitions and national hockey
competitions.
An approach from the roads
bordering the stadium from the
Western and Northern ends brings
visitors to a security post and
two other entrances for
spectators. There is provision
for 4 ticketing rooms.
From the car park one sees the
imposing V.I.P. building. The
stadium has a three floor V.I.P.
structure with the following
facilities:
-
Four (4) players
changing rooms with a
capacity of 22 each
-
An anti-doping room
-
Medical Room
-
A massage area
-
Two Umpires’ changing
rooms with showers
-
A 400 seating capacity
V.V.I.P. stands
-
Player Media Interaction
Lounge
A stair from the ground floor
brings one to an entrance lobby
on the first floor which has an
adjoining balcony overlooking
the car park. Other facilities
on this floor are:
-
Ghana Hockey
Office
-
Breathtaking and Serene
VVIP lounge
-
A bar with a seating
capacity of 22.
-
Restaurant that can seat
about 44 people
The second floor of the VIP
structure comprises:
-
A 72 capacity Media
conference room.
-
A media centre with the
capacity
-
Commentators room to
take 20 people
-
Two viewing areas
-
Stadium central control
room
-
3 offices that can be
allocated to the TD,UM
and an event Secretariat
The Eastern side of the stadium
has stands with a capacity of
800 spectators.
The North has the LED
Scoreboard, a Technical building
that houses a stand-by
generator, Washrooms and First
aid room for fans.
The Southern end has a Hostel of
16 rooms with a total capacity
to take 64 people, two servery
outlets, a gymnasium with 80
person capacity and two number
T.V. rooms on the two upper